Air Pollution Control (Specified Processes) (Specification of Required Particulars and Information) Order 1994
(Enacting provision omitted—E.R. 1 of 2023)
[26 August 1994]
(Format changes—E.R. 1 of 2023)
The owner of premises used for the conduct of any of the specified processes listed in Schedule 1 shall give to the Authority a written notice, containing the particulars and information specified in the form set out in Schedule 2, of the existence of the premises.
Organic Chemical Works
Zinc Galvanising Works
Rendering Works
Non-ferrous Metallurgical Works
Glass Works
(Chapter 311)NOTIFICATION OF THE EXISTENCE OF PREMISES USED FOR THE CONDUCT
OF A SPECIFIED PROCESS PURSUANT TO SECTION 19(1)
| To: The Authority | |
| 1. I/We* the undersigned, being the owner/owners* specified in paragraph 2 of the undermentioned premises, hereby give notice that the premises described in paragraph 3 are used for the conduct of the process specified in paragraph 4 and declare that the particulars and information furnished hereunder are correct. | |
| This notification consists of . pages, with associated drawing (. sheets). | |
| Signature: | |
| Name: | |
| Date: | |
| 2. Details of Owner(s) | |||||
| Name(s) of Owner(s) (Surname first) | Status (e.g. lessee, occupier) | Correspondence Address | Telephone Number | Identity Card/ Certificate of Incorporation* Number | |
| English | Chinese | ||||
| 3. Premises where the Specified Process is Conducted | |||||||||
| Name of Premises | Address | Telephone Number | |||||||
| English | Chinese | ||||||||
| Contact Person in the Premises (Surname first) | Title or Position | Correspondence Address | Telephone Number | ||||||
| English | Chinese | ||||||||
| Business Registration No. | Certificate of Incorporation No. | No. of Employees in the Premises | Area of the Premises (m2) | Land Status | |||||
| Name(s) of Land Owner(s) | Address | Telephone Number | |||||||
| English | Chinese | ||||||||
| 4. Nature of Work | ||||||||
| Specified Process referred in Schedule 1 to the Ordinance | ||||||||
| Brief Description of Process | ||||||||
| Raw materials with Percentage Composition | ||||||||
| Products with Percentage Composition | ||||||||
| Raw Materials Consumption Rates (tonnes) | Hourly | Normal | Product Production Rates (tonnes) | Hourly | Normal | |||
| Maximum | Maximum | |||||||
| Daily | Daily | |||||||
| Monthly | Monthly | |||||||
| Annual | Annual | |||||||
| Installed/Processing* Capacity | ||||||||
| Total Storage Capacity of the Tanks used to store Organic Liquids (For Organic Chemical Works Only) | ||||||||
| Operating Schedule | Normal Operating Hours | From To | ||||||
| Operating Hours per Day | ||||||||
| Operating Days per Year | ||||||||
| 5. Particulars of the Emission Points and Associated Equipment | ||||||||||
| A. Emission Point where Air Pollutant is Emitted | ||||||||||
| Emission Point No. | ||||||||||
| Discharge Exit or Chimney Height (m above ground) | ||||||||||
| Cross-section of Discharge Exit or Chimney | Width (m) | |||||||||
| Length (m) | ||||||||||
| Diameter (m) | ||||||||||
| B. Associated Equipment from which the Air Pollutant is Generated | ||||||||||
| Type of Equipment | ||||||||||
| Equipment No. | ||||||||||
| Date of Installation | ||||||||||
| Dimensions of Equipment | Width (m) | |||||||||
| Length (m) | ||||||||||
| Height (m) | ||||||||||
| Diameter (m) | ||||||||||
| Mode of Operation (Continuous/Batch) | ||||||||||
| Installed/Processing* Capacity | ||||||||||
| For Batch Process | Duration of each Batch (h) | |||||||||
| No. of Batches per Day | ||||||||||
| For Tanks Used to Store Organic Liquids, including Liquid Fuels | Type of Organic Liquid Stored | |||||||||
| Tank Storage Capacity (m3) | ||||||||||
| Fuel Using Equipment | Type of Fuel Using Equipment | |||||||||
| Fuel to be Used | Type | |||||||||
| Ash Content (%) | ||||||||||
| Sulphur Content (%) | ||||||||||
| Other Specifications | ||||||||||
| Fuel Consumption Rate (kg/h) | Maximum | |||||||||
| Normal | ||||||||||
| Air Pollution Control Equipment Incorporated | Type | |||||||||
| Pollutant to be Controlled | ||||||||||
| Designed Efficiency (%) | ||||||||||
| Operating Schedule | Operating Hours per Day | |||||||||
| Operating Days per Month | ||||||||||
| 6. | Drawings | ||
| (1) | Please provide— | ||
| (a) | schematic diagrams of process flow showing the flow of materials, including raw materials, materials in process of manufacture, manufactured materials, by-products and waste materials; and | ||
| (b) | a block plan showing the locations of all emission points in the premises with consistent reference numbers. | ||
| (2) All emission points and processes/equipment, including air pollution control equipment, associated with each emission point, must be identified and labelled with consistent reference numbers. | |||
* Delete whichever is inapplicable.