Cap. 311G 《1993年空氣污染管制(指明工序)(所需詳情及資料的指明)令》Air Pollution Control (Specified Processes) (Specification of Required Particulars and Information) Order 1993

生效中
版本日期: 2023-03-09

Air Pollution Control (Specified Processes) (Specification of Required Particulars and Information) Order 1993

(L.N. 478 of 1994)

(Cap. 311, section 19(1))

(Enacting provision omitted—E.R. 1 of 2023)

[6 August 1993]

(Format changes—E.R. 1 of 2023)

1. Notice of existing premises used for specified processes

Notice of the existence of premises used for the conduct of any of the specified processes listed in Schedule 1, containing the particulars and information specified in the form set out in Schedule 2, shall be given in writing by the owner of the premises to the Authority, in the manner specified in that form.

2. (Omitted as spent—E.R. 1 of 2023)

Schedule 1 — Specified Processes

[s. 1]
1. Aluminium Works
2. Cement Works
3. Ceramic Works
4. Copper Works
5. Gas Works
6. Petrochemical Works
7. Sulphuric Acid Works
8. Tar and Bitumen Works
9. Lead Works
10. Asbestos Works
11. Chemical Incineration Works
12. Hydrochloric Acid Works
13. Hydrogen Cyanide Works
14. Sulphide Works
15. Pathological Waste Incinerators
16. Petroleum Works

Schedule 2 — Form

[s. 1]

(Chapter 311)NOTIFICATION OF THE EXISTENCE OF PREMISES USED FOR THE CONDUCT
OF A SPECIFIED PROCESS PURSUANT TO SECTION 19(1)

To: The Authority
1. I/We* the undersigned, being the owner/owners* specified in paragraph 2 of the undermentioned premises, hereby give notice that the premises described in paragraph 3 are used for the conduct of the process specified in paragraph 4 and declare that the particulars and information furnished hereunder are correct.
This notification consists of . pages, with associated drawing (. sheets).
Signature:
Name:
Date:
2. Details of Owner(s)
Name(s) of Owner(s)
(Surname First)
Status
(e.g. lessee, occupier)
Correspondence Address Telephone
Number
Identity Card/
Certificate of
Incorporation* Number
English Chinese
3. Premises where the Specified Process is Conducted
Name of Premises Address Telephone
Number
English Chinese
Contact Person in the
Premises (Surname First)
Title or Position Correspondence Address Telephone
Number
English Chinese
Business
Registration No.
Certificate of
Incorporation No.
No. of Employees
in the Premises
Area of the
Premises (m2)
Land
Status
Name(s) of Land Owner(s) Address Telephone
Number
English Chinese
4. Nature of Work
Specified Process referred in Schedule 1 to the Ordinance
Brief Description
of Process
Raw materials with
Percentage Composition
Products with
Percentage Composition
Raw Materials Consumption Rates (tonnes) Hourly Normal Product Production Rates (tonnes) Hourly Normal
Maximum Maximum
Daily Daily
Monthly Monthly
Annual Annual
Installed/Processing* Capacity
Total Silo Capacity (For Cement Works only)
Operating Schedule Normal Operating Hours From To
Operating Hours per Day
Operating Days per Year
5. Fuel Using/processing Equipment
Emission Point No.
Discharge Exit or Chimney Height (m above ground)
Cross-section of Discharge
Exit or Chimney
Width (m)
Length (m)
Diameter(m)
Equipment Serving
the Emission Point
Type of Equipment
Equipment No.
Date of Installation
Dimensions
of Equipment
Width (m)
Length (m)
Height (m)
Diameter (m)
Mode of Operation (Continuous/Batch)
Installed/Processing* Capacity
For Batch Process Duration of each Batch (h)
No. of Batches per Day
For Fuel Using Equipment Type of Fuel Using Equipment
Date of Installation
Fuel to be Used Type
Ash Content (%)
Sulphur Content (%)
Other Specifications
Fuel Consumption Rate
(kg/h)
Maximum
Normal
Air Pollution Control Equipment Type
Pollutant to be Controlled
Designed Efficiency (%)
Operating Schedule Operating Hours per Day
Operating Days per Month
6. Drawings
Please provide schematic diagrams of process flow showing the flow of materials, including raw materials in process of manufacture, manufactured materials, by-products and waste materials. All emission points and processes/equipment, including air pollution control equipment, associated with each emission point, must be identified and labelled with consistent reference numbers.

* Delete whichever is inapplicable.(L.N. 212 of 1996; E.R. 1 of 2023)