Cap. 245J 《禁區(深圳灣公路大橋香港段及后海灣幹線部分路段)令》Closed Area (Hong Kong Section of the Shenzhen Bay Bridge and Deep Bay Link Portion) Order
生效中Closed Area (Hong Kong Section of the Shenzhen Bay Bridge and Deep Bay Link Portion) Order
(Enacting provision omitted—E.R. 1 of 2019)
[1 July 2007] L.N. 137 of 2007
(Format changes—E.R. 1 of 2019)
1. (Omitted as spent—E.R. 1 of 2019)
2. Declaration of closed area
The area enclosed by the boundaries set out in Part 1 of the Schedule (the Area) is declared to be a closed area.
Schedule — Closed Area
[s. 2]Part 1 — Boundaries of Closed Area
1. Horizontal boundaries
The horizontal boundaries of the Area are the outermost left and right edge lines of—
the Hong Kong section of the Shenzhen Bay Bridge which is described as such and shown stippled black on the map set out in Part 2; and
the Deep Bay Link Portion which is described as such and shown coloured grey on the map set out in Part 2.
2. Vertical boundaries
The upper vertical boundary of the Area is—
in relation to the Hong Kong section of the Shenzhen Bay Bridge referred to in section 1(a), set at an elevation of +165 mPD (metres above Hong Kong Principal Datum); and
in relation to the Deep Bay Link Portion referred to in section 1(b), set at an elevation of +60 mPD (metres above Hong Kong Principal Datum).
The lower vertical boundary of the Area is—
in relation to the Hong Kong section of the Shenzhen Bay Bridge referred to in section 1(a), the bottom parallel edge lines of the bridge box girders; and
in relation to the Deep Bay Link Portion referred to in section 1(b), set at 4 m below the road surface.