Air Pollution Control (Specified Processes) (Specification of Required Particulars and Information) Order 1994
(Enacting provision omitted—E.R. 1 of 2023)
[26 August 1994]
(Format changes—E.R. 1 of 2023)
The owner of premises used for the conduct of any of the specified processes listed in Schedule 1 shall give to the Authority a written notice, containing the particulars and information specified in the form set out in Schedule 2, of the existence of the premises.
(Omitted as spent—E.R. 1 of 2023)
Organic Chemical Works
Zinc Galvanising Works
Rendering Works
Non-ferrous Metallurgical Works
Glass Works
(Chapter 311)NOTIFICATION OF THE EXISTENCE OF PREMISES USED FOR THE CONDUCT
OF A SPECIFIED PROCESS PURSUANT TO SECTION 19(1)
| To: The Authority | |
| 1. I/We* the undersigned, being the owner/owners* specified in paragraph 2 of the undermentioned premises, hereby give notice that the premises described in paragraph 3 are used for the conduct of the process specified in paragraph 4 and declare that the particulars and information furnished hereunder are correct. | |
| This notification consists of . pages, with associated drawing (. sheets). | |
| Signature: | |
| Name: | |
| Date: | |
| 2. Details of Owner(s) | |||||
| Name(s) of Owner(s) (Surname first) | Status (e.g. lessee, occupier) | Correspondence Address | Telephone Number | Identity Card/ Certificate of Incorporation* Number | |
| English | Chinese | ||||
| 3. Premises where the Specified Process is Conducted | |||||||||
| Name of Premises | Address | Telephone Number | |||||||
| English | Chinese | ||||||||
| Contact Person in the Premises (Surname first) | Title or Position | Correspondence Address | Telephone Number | ||||||
| English | Chinese | ||||||||
| Business Registration No. | Certificate of Incorporation No. | No. of Employees in the Premises | Area of the Premises (m2) | Land Status | |||||
| Name(s) of Land Owner(s) | Address | Telephone Number | |||||||
| English | Chinese | ||||||||
| 4. Nature of Work | ||||||||
| Specified Process referred in Schedule 1 to the Ordinance | ||||||||
| Brief Description of Process | ||||||||
| Raw materials with Percentage Composition | ||||||||
| Products with Percentage Composition | ||||||||
| Raw Materials Consumption Rates (tonnes) | Hourly | Normal | Product Production Rates (tonnes) | Hourly | Normal | |||
| Maximum | Maximum | |||||||
| Daily | Daily | |||||||
| Monthly | Monthly | |||||||
| Annual | Annual | |||||||
| Installed/Processing* Capacity | ||||||||
| Total Storage Capacity of the Tanks used to store Organic Liquids (For Organic Chemical Works Only) | ||||||||
| Operating Schedule | Normal Operating Hours | From To | ||||||
| Operating Hours per Day | ||||||||
| Operating Days per Year | ||||||||
| 5. Particulars of the Emission Points and Associated Equipment | ||||||||||
| A. Emission Point where Air Pollutant is Emitted | ||||||||||
| Emission Point No. | ||||||||||
| Discharge Exit or Chimney Height (m above ground) | ||||||||||
| Cross-section of Discharge Exit or Chimney | Width (m) | |||||||||
| Length (m) | ||||||||||
| Diameter (m) | ||||||||||
| B. Associated Equipment from which the Air Pollutant is Generated | ||||||||||
| Type of Equipment | ||||||||||
| Equipment No. | ||||||||||
| Date of Installation | ||||||||||
| Dimensions of Equipment | Width (m) | |||||||||
| Length (m) | ||||||||||
| Height (m) | ||||||||||
| Diameter (m) | ||||||||||
| Mode of Operation (Continuous/Batch) | ||||||||||
| Installed/Processing* Capacity | ||||||||||
| For Batch Process | Duration of each Batch (h) | |||||||||
| No. of Batches per Day | ||||||||||
| For Tanks Used to Store Organic Liquids, including Liquid Fuels | Type of Organic Liquid Stored | |||||||||
| Tank Storage Capacity (m3) | ||||||||||
| Fuel Using Equipment | Type of Fuel Using Equipment | |||||||||
| Fuel to be Used | Type | |||||||||
| Ash Content (%) | ||||||||||
| Sulphur Content (%) | ||||||||||
| Other Specifications | ||||||||||
| Fuel Consumption Rate (kg/h) | Maximum | |||||||||
| Normal | ||||||||||
| Air Pollution Control Equipment Incorporated | Type | |||||||||
| Pollutant to be Controlled | ||||||||||
| Designed Efficiency (%) | ||||||||||
| Operating Schedule | Operating Hours per Day | |||||||||
| Operating Days per Month | ||||||||||
| 6. | Drawings | ||
| (1) | Please provide— | ||
| (a) | schematic diagrams of process flow showing the flow of materials, including raw materials, materials in process of manufacture, manufactured materials, by-products and waste materials; and | ||
| (b) | a block plan showing the locations of all emission points in the premises with consistent reference numbers. | ||
| (2) All emission points and processes/equipment, including air pollution control equipment, associated with each emission point, must be identified and labelled with consistent reference numbers. | |||
* Delete whichever is inapplicable.