In this Regulation, unless the context otherwise requires—
area (面積), in relation to a local vessel, means the product of the length overall and the extreme breadth of the vessel; Category A vessel (A類船隻) means a local vessel that is—(a)of a class and type specified in columns 1 and 2 of Schedule 1 to the Survey Regulation; and(b)categorized as a Category A vessel in column 3 of that Schedule; Category B vessel (B類船隻) means a local vessel that is—(a)of a class and type specified in columns 1 and 2 of Schedule 1 to the Survey Regulation; and(b)categorized as a Category B vessel in column 3 of that Schedule; certificate of inspection (檢查證明書) means a certificate of inspection issued under section 19(2) of the Survey Regulation; certificate of survey (驗船證明書) means a certificate of survey issued under section 24(1) of the Survey Regulation; Certification and Licensing Regulation (《證明書及牌照規例》) means the Merchant Shipping (Local Vessels) (Certification and Licensing) Regulation (Cap. 548 sub. leg. D); class (類別), in relation to a local vessel, means a class of local vessel specified in column 1 of Schedule 1 to the Certification and Licensing Regulation; classification society (船級社) means an organization approved under section 8 of the Merchant Shipping (Safety) Ordinance (Cap. 369); declaration of fitness (適合運載危險品聲明) means a declaration of fitness for the carriage of dangerous goods issued under section 54 or 65(4) of the Survey Regulation; extreme breadth (最大寬度), in relation to a local vessel, means the athwartship distance between the extremity of the outermost permanent structure on the port side and the extremity of the outermost permanent structure on the starboard side of the vessel; Ferry Terminals Regulation (《渡輪終點碼頭規例》) means the Merchant Shipping (Local Vessels) (Ferry Terminals) Regulation (Cap. 548 sub. leg. B); freeboard assignment certificate (乾舷勘定證明書) means a freeboard assignment certificate issued under section 46 or 65(4) of the Survey Regulation; full licence (正式牌照) means—(a)a full licence issued under section 15 of the Certification and Licensing Regulation or renewed under section 17 of that Regulation; or(b)a full licence issued, endorsed or renewed under section 23 or 26 of the Certification and Licensing Regulation (including, in the case of section 23 of that Regulation, that section as applied by section 29 of that Regulation); General Regulation (《一般規例》) means the Merchant Shipping (Local Vessels) (General) Regulation (Cap. 548 sub. leg. F); gross tonnage (總噸位), in relation to a local vessel, means the gross tonnage specified in the certificate of ownership issued in respect of the vessel; Hong Kong load line certificate (香港載重線證明書) means a Hong Kong load line certificate issued under section 46 or 65(4) of the Survey Regulation; monthly period (一個月期間) means a period beginning on a day in a calendar month and ending on—(a)the day before the corresponding day in the following calendar month;(b)if the period begins on a day that is the last day of a calendar month, the day before the last day of the following calendar month;(c)if the period begins on 30 January in a leap year, the next following 28 February; or(d)if the period begins on 29 or 30 January in any year other than a leap year, the next following 27 February; net tonnage (淨噸位), in relation to a local vessel, means the net tonnage specified in the certificate of ownership issued in respect of the vessel; office hours (辦公時間) means the hours between 8:30 a.m. and 5:45 p.m. on Monday to Friday, excluding general holidays; permission for a laid-up vessel (閑置船隻允許書) means the written permission granted under section 66 of the Ordinance for a laid-up vessel to be berthed, moored or anchored at any place in the waters of Hong Kong, including such permission that is endorsed or granted under section 23 or 26 of the Certification and Licensing Regulation (including, in the case of section 23 of that Regulation, that section as applied by section 29 of that Regulation); specified officer (指明人員) means—(a)the Director; or(b)a public officer to whom the Director has delegated any of his functions or powers under section 72 of the Ordinance; survey record of safety equipment (安全設備檢驗紀錄) means a survey record of safety equipment issued under section 39 or 65(4) of the Survey Regulation; Survey Regulation (《檢驗規例》) means the Merchant Shipping (Local Vessels) (Safety and Survey) Regulation (Cap. 548 sub. leg. G); temporary licence (臨時牌照) means—(a)a temporary licence issued or renewed under section 19 of the Certification and Licensing Regulation; or(b)a temporary licence issued, endorsed or renewed under section 23 or 26 of that Regulation (including, in the case of section 23 of that Regulation, that section as applied by section 29 of that Regulation); type (類型), in relation to a local vessel, means a type of local vessel specified in column 2 of Schedule 1 to the Certification and Licensing Regulation; Typhoon Shelters Regulation (《避風塘規例》) means the Merchant Shipping (Local Vessels) (Typhoon Shelters) Regulation (Cap. 548 sub. leg. E); yearly period (一年期間) means a period beginning on a day in a calendar year and ending on—(a)the day before the corresponding day in the following calendar year; or(b)if the period begins on 29 February in a leap year, 27 February in the following calendar year.In this Regulation, except where otherwise specially provided—
a reference to a local vessel of any class and of any type is a reference to a local vessel certificated for that class and for that type in accordance with section 4 of the Certification and Licensing Regulation; and
a reference to a Class I, II, III or IV vessel is a reference to a local vessel certificated for Class I, II, III or IV respectively under the Certification and Licensing Regulation.
The fee to be paid in respect of an application under section 13 of the Ferry Terminals Regulation for the issue of a standard pass by a person who is not an authorized officer is $105.
The fee to be paid in respect of the issue of a replacement pass under section 24 of the Ferry Terminals Regulation is $180.
The fee to be paid under section 28 of the Ferry Terminals Regulation for berthing in respect of a local vessel is—
in the case where the vessel is a ferry vessel that is a dynamically supported craft, $3 per unit of the chargeable net tonnage of the vessel;
in the case where the vessel is a ferry vessel that is not a dynamically supported craft, $1.5 per unit of the chargeable net tonnage of the vessel;
in the case of any other vessel, $3 per unit of the chargeable net tonnage of the vessel.
(Repealed L.N. 57 of 2020)
In this section—
authorized officer (獲授權人員) means an authorized officer within the meaning of section 2 of the Ferry Terminals Regulation; chargeable net tonnage (須予繳費淨噸位), in relation to a local vessel, means— (a)the net tonnage of the vessel; or (b)if that net tonnage is not a whole number, the net tonnage rounded up to the next whole number; ferry vessel (渡輪船隻) means a ferry vessel within the meaning of section 2 of the Ferry Terminals Regulation.Subject to subsections (2) and (3), the fee to be paid in respect of an application under section 15, 17 or 19 of the Certification and Licensing Regulation for the issue or renewal of a full licence, or a temporary licence, in respect of a local vessel of a type described in column 2 of Part 2 of Schedule 1 is—
in the case of a licence valid for a period of 12 months, the fee specified in column 3 of that Part opposite the type of vessel;
in the case of a licence valid for a period of less than 12 months, a fee equal to the aggregate of the following amounts—
for each of the following within the validity period—
the monthly period beginning on the first day of the validity period;
each subsequent monthly period,
an amount equal to 1/12 of the fee specified in column 3 of that Part opposite the type of vessel;
for each day within the validity period that does not fall within a monthly period referred to in subparagraph (i), an amount equal to 1/365 of the fee specified in column 3 of that Part opposite the type of vessel.
If the licence is issued or renewed in respect of a Class IV vessel and permits the vessel to carry more than 14 persons, there shall be payable in respect of the application an additional fee of—
in the case of a licence valid for a period of 12 months, the amount specified in subsection (4);
in the case of a licence valid for a period of less than 12 months, an amount equal to the aggregate of the following amounts—
for each of the following within the validity period—
the monthly period beginning on the first day of the validity period;
each subsequent monthly period,
an amount equal to 1/12 of the amount specified in subsection (4);
for each day within the validity period that does not fall within a monthly period referred to in subparagraph (i), an amount equal to 1/365 of the amount specified in subsection (4).
If the licence is issued or renewed in respect of a floating restaurant, or a stationary vessel that is certificated as a Class I vessel, there shall be payable in respect of the application an additional fee of—
in the case of a licence valid for a period of 12 months, the amount specified in subsection (5);
in the case of a licence valid for a period of less than 12 months, an amount equal to the aggregate of the following amounts—
for each of the following within the validity period—
the monthly period beginning on the first day of the validity period;
each subsequent monthly period,
an amount equal to 1/12 of the amount specified in subsection (5);
for each day within the validity period that does not fall within a monthly period referred to in subparagraph (i), an amount equal to 1/365 of the amount specified in subsection (5).
The amount specified for the purposes of subsection (2) is the aggregate of the following amounts—
for the first 15 persons that the vessel concerned is permitted to carry, $165;
for each additional person that the vessel concerned is permitted to carry, $165.
The amount specified for the purposes of subsection (3) is, for each person that the vessel concerned is permitted to carry, $165.
The fee to be paid in respect of an application under section 21 of the Certification and Licensing Regulation for the grant of permission for a laid-up vessel in respect of a local vessel of a type described in column 2 of Part 2 of Schedule 1 is—
in the case of a permission for the vessel to be berthed, moored or anchored at any place in the waters of Hong Kong for a period of 12 months, the fee specified in column 3 of that Part opposite the type of vessel;
in the case of a permission for the vessel to be berthed, moored or anchored at any place in the waters of Hong Kong for a period of less than 12 months, a fee equal to the aggregate of the following amounts—
for each of the following within the permission period—
the monthly period beginning on the first day of the permission period;
each subsequent monthly period,
an amount equal to 1/12 of the fee specified in column 3 of that Part opposite the type of vessel;
for each day within the permission period that does not fall within a monthly period referred to in subparagraph (i), an amount equal to 1/365 of the fee specified in column 3 of that Part opposite the type of vessel;
in the case of a permission for the vessel to be berthed, moored or anchored at any place in the waters of Hong Kong for a period of more than 12 months, a fee equal to the aggregate of the following amounts—
for each of the following within the permission period—
the yearly period beginning on the first day of the permission period;
each subsequent yearly period,
the fee specified in column 3 of that Part opposite the type of vessel;
for each of the following within the permission period—
the monthly period beginning on the day immediately following the last day of the yearly period or the last yearly period, as the case may be, referred to in subparagraph (i);
each subsequent monthly period,
an amount equal to 1/12 of the fee specified in column 3 of that Part opposite the type of vessel;
for each day within the permission period that does not fall within subparagraph (i) or (ii), an amount equal to 1/365 of the fee specified in column 3 of that Part opposite the type of vessel.
(Omitted as expired—E.R. 2 of 2024)
The fee to be paid in respect of terminating the suspension of a certificate of survey, and a full licence or temporary licence, under section 33(5) of the Certification and Licensing Regulation after a re-inspection by a relevant surveyor of the local vessel concerned is a fee equal to the aggregate of the following amounts—
for the first hour of the service period of each relevant surveyor for the re-inspection, $3,270;
for each subsequent hour of the service period of each of such relevant surveyor for the re-inspection, $1,115.
In this section—
relevant surveyor (有關驗船師) means—(a)a Government surveyor; or(b)a ship inspector within the meaning of section 33(7) of the Certification and Licensing Regulation; service period (服務期間), in relation to a re-inspection carried out by a relevant surveyor of a local vessel, means—(a)the period of time, in hours, during which the re-inspection continues; or(b)if that period of time is not a whole number, the period of time rounded up to the next whole number.The fee to be paid in respect of a matter described in column 2 of Part 3 of Schedule 1 is the fee specified in column 3 of that Part opposite the matter.
The Director may waive the fee to be paid in respect of the issue of a duplicate of a certificate of ownership, full licence, temporary licence or permission for a laid-up vessel under section 54(1) of the Certification and Licensing Regulation if he is satisfied that the original of the certificate, licence or permission has been destroyed, defaced or lost through fire or shipwreck.
The fee to be paid in respect of a matter described in column 2 of Schedule 2 is the fee specified in column 3 of that Schedule opposite the matter.
(Omitted as expired—E.R. 2 of 2024)
In this Part—
consideration period (考慮期間), in relation to the consideration of plans by a specified officer, means—(a)the period of time, in hours, during which the consideration continues; or(b)if that period of time is not a whole number, the period of time rounded up to the next whole number; service period (服務期間), in relation to a survey or re-inspection carried out by a specified officer, means—(a)the period of time, in hours, during which the survey or re-inspection continues; or(b)if that period of time is not a whole number, the period of time rounded up to the next whole number; travel period (出差期間), in relation to a survey or re-inspection carried out by a specified officer, means the period of time during which the officer is outside Hong Kong on account of the survey or re-inspection.For the purposes of the definition of travel period, a specified officer is outside Hong Kong from the moment when he departs from Hong Kong to the moment when he arrives at Hong Kong.
The fee to be paid under sections 8(4)(e) and 11(3) of the Survey Regulation is—
in the case of an application for approval, for the purposes of section 9(1) of that Regulation, of plans relating to a specified vessel, $1,115 for each hour of the consideration period of a specified officer for considering the plans;
in the case of an application for approval, for the purposes of section 9(1), (2) or (3) of that Regulation, of relevant plans relating to a non-specified vessel of a type described in column 2 of Part 2 of Schedule 3, the fee specified in column 4 of that Part opposite the description of the plans;
in the case of an application for approval, for the purposes of section 9(4) of that Regulation, of plans relating to a non-specified vessel, $3,600.
The fee to be paid under section 14(3) of the Survey Regulation is—
in the case where the plans relating to a specified vessel are considered for the purposes of section 9(1) of that Regulation, $1,115 for each hour of the consideration period of a specified officer for considering the plans;
in the case where the relevant plans relating to a non-specified vessel of a type described in column 2 of Part 2 of Schedule 3 are considered for the purposes of section 9(1), (2) or (3) of that Regulation, the fee specified in column 4 of that Part opposite the description of the plans;
in the case where the plans relating to a non-specified vessel are considered for the purposes of section 9(4) of that Regulation, $3,600.
In this section—
non-specified vessel (非指明船隻) means a local vessel that is not a specified vessel; relevant plan (有關圖則), in relation to a non-specified vessel of a type described in column 2 of Part 2 of Schedule 3, means a plan described in column 3 of that Part opposite the type of vessel; specified vessel (指明船隻) means a Class IV vessel that falls within section 7(3)(b) or (ba) of the Survey Regulation. (L.N. 71 of 2020)The fee, under section 76(5)(d)(i) of the Survey Regulation, to be paid in respect of the consideration of plans and, as the case may be, the approval of plans relating to a local vessel is—
in the case where the plans are considered in relation to a permission to make an alteration to a local vessel to an extent that will render the particulars stated in a certificate of inspection in force in respect of the vessel inaccurate, $1,115 for each hour of the consideration period of a specified officer for considering the plans;
in the case where the plans are considered in relation to a permission to make an alteration to a local vessel of a type described in column 2 of Part 2 of Schedule 3 to an extent that will render the particulars specified in subsection (2) inaccurate, 1/10 of the fee specified in column 4 of that Part opposite the description of the relevant plans relating to the vessel;
in the case where the plans are considered in relation to a permission to make an alteration to a local vessel to an extent that will render the particulars stated in a declaration of fitness in force in respect of the vessel inaccurate, $1,200.
The particulars specified for the purposes of subsection (1)(b) are those stated in a certificate of survey, survey record of safety equipment, Hong Kong load line certificate, or freeboard assignment certificate in force in respect of the local vessel concerned.
Subject to sections 16 and 17, the fee to be paid under section 17(4)(b) of the Survey Regulation is—
in the case of an application for survey, for the purposes of the issue of a certificate of survey valid for not more than 3 months, of a local vessel of a type described in column 2 of Part 3 of Schedule 3—
for the first 3 relevant visits to the vessel for the survey, 1/2 of the fee specified in column 3 of that Part opposite the type of vessel; and
for each subsequent relevant visit to the vessel for the survey, 1/8 of the fee specified in column 3 of that Part opposite the type of vessel;
in the case of an application for survey, for the purposes of the issue of a certificate of survey valid for more than 3 months, of a local vessel of a type described in column 2 of Part 3 of Schedule 3—
for the first 3 relevant visits to the vessel for the survey, the fee specified in column 3 of that Part opposite the type of vessel; and
for each subsequent relevant visit to the vessel for the survey, 1/4 of the fee specified in column 3 of that Part opposite the type of vessel;
in the case of an application for survey, for the purposes of the issue of a certificate of survey, of a floating dock that is not classed with a classification society is—
for the first hour of the service period of each specified officer for the survey, $3,270; and
for each subsequent hour of the service period of each specified officer for the survey, $1,115;
in the case of an application for survey, for the purposes of the issue of a certificate of inspection, of a Class IV vessel that falls within section 15(2)(b) or (ba) of the Survey Regulation— (L.N. 71 of 2020)
for the first 3 relevant visits to the vessel for the survey, $2,200; and
for each subsequent relevant visit to the vessel for the survey, $550.
For the purposes of subsection (1), each visit by each specified officer to a local vessel for the purposes of a survey is counted as one relevant visit to the vessel for the survey.
Subject to sections 16 and 17, the fee to be paid under section 57(1) of the Survey Regulation is—
in the case of an application for survey, for the purposes of the issue of a survey record of safety equipment, of a local vessel of a type described in column 2 of Part 4 of Schedule 3—
where the survey record is valid for not more than 3 months—
for the first 3 relevant visits to the vessel for the survey, 1/2 of the fee specified in column 3 of that Part opposite the type of vessel; and
for each subsequent relevant visit to the vessel for the survey, 1/8 of the fee specified in column 3 of that Part opposite the type of vessel;
where the survey record is valid for more than 3 months—
for the first 3 relevant visits to the vessel for the survey, the fee specified in column 3 of that Part opposite the type of vessel; and
for each subsequent relevant visit to the vessel for the survey, 1/4 of the fee specified in column 3 of that Part opposite the type of vessel;
in the case of an application for survey, for the purposes of the issue of a Hong Kong load line certificate, of a local vessel of a type described in column 2 of Part 5 of Schedule 3—
where the certificate is valid for not more than 3 months—
for the first 3 relevant visits to the vessel for the survey, 1/2 of the fee specified in column 3 of that Part opposite the type of vessel; and
for each subsequent relevant visit to the vessel for the survey, 1/8 of the fee specified in column 3 of that Part opposite the type of vessel;
where the certificate is valid for more than 3 months—
for the first 3 relevant visits to the vessel for the survey, the fee specified in column 3 of that Part opposite the type of vessel; and
for each subsequent relevant visit to the vessel for the survey, 1/4 of the fee specified in column 3 of that Part opposite the type of vessel;
in the case of an application for survey, for the purposes of the issue of a freeboard assignment certificate, of a local vessel of a type described in column 2 of Part 6 of Schedule 3—
where the certificate is valid for not more than 3 months—
for the first 3 relevant visits to the vessel for the survey, 1/2 of the fee specified in column 3 of that Part opposite the type of vessel; and
for each subsequent relevant visit to the vessel for the survey, 1/8 of the fee specified in column 3 of that Part opposite the type of vessel;
where the certificate is valid for more than 3 months—
for the first 3 relevant visits to the vessel for the survey, the fee specified in column 3 of that Part opposite the type of vessel; and
for each subsequent relevant visit to the vessel for the survey, 1/4 of the fee specified in column 3 of that Part opposite the type of vessel;
in the case of an application for survey, for the purposes of the issue of a declaration of fitness, of a local vessel of a type described in column 2 of Part 7 of Schedule 3—
where the declaration of fitness is valid for not more than 3 months—
for the first 3 relevant visits to the vessel for the survey, 1/2 of the fee specified in column 3 of that Part opposite the type of vessel; and
for each subsequent relevant visit to the vessel for the survey, 1/8 of the fee specified in column 3 of that Part opposite the type of vessel;
where the declaration of fitness is valid for more than 3 months—
for the first 3 relevant visits to the vessel for the survey, the fee specified in column 3 of that Part opposite the type of vessel; and
for each subsequent relevant visit to the vessel for the survey, 1/4 of the fee specified in column 3 of that Part opposite the type of vessel.
For the purposes of subsection (1), each visit by each specified officer to a local vessel for the purposes of a survey is counted as one relevant visit to the vessel for the survey.
Subject to sections 16 and 17, the fee, under section 76(5)(d)(ii) of the Survey Regulation, to be paid in respect of a survey of a local vessel by a specified officer is—
for the first hour of the service period of each officer for the survey, $3,270; and
for each subsequent hour of the service period of each officer for the survey, $1,115.
Subject to sections 16 and 17, the fee to be paid under section 21(3), 26(3) or 65(3) of the Survey Regulation for the re-inspection of a local vessel by a specified officer is—
for the first hour of the service period of each officer for the re-inspection, $3,270; and
for each subsequent hour of the service period of each officer for the re-inspection, $1,115.
If the survey referred to in section 12, 13 or 14, or the re-inspection referred to in section 15, or part of the survey or re-inspection, is carried out outside Hong Kong by a specified officer sent from Hong Kong, there shall be payable, in addition to the fee prescribed under that section, a fee equal to the aggregate of the following amounts—
for each of the following—
the first 24 hours, or part of it, of the travel period of each officer for the survey or re-inspection or that part;
each subsequent period of 24 hours, if any, of that travel period;
the remaining time of that travel period,
an amount of $7,645;
an amount that is, in the opinion of the Director, equivalent to the travelling and subsistence expenses of each officer incurred during that travel period.
If the survey referred to in section 12, 13 or 14, or the re-inspection referred to in section 15, or part of the survey or re-inspection, is carried out (whether within Hong Kong or not) by a specified officer outside office hours, there shall be payable, in addition to the fee prescribed under that section—
subject to paragraph (c), if the day of service is a weekday (other than a Saturday)—
for each hour of the service period of each officer for the survey or re-inspection or that part between 6:30 a.m. and 8:30 a.m. or between 5:45 p.m. and 7:45 p.m., a fee of $1,115; and
for each hour of the service period of each officer for the survey or re-inspection or that part before 6:30 a.m. or after 7:45 p.m., a fee of $2,215;
if the day of service is a Saturday or Sunday, for each hour of the service period of each officer for the survey or re-inspection or that part, a fee of $3,270;
if the day of service falls on a calendar day that is a general holiday (other than a Saturday or Sunday) in Hong Kong, for each hour of the service period of each officer for the survey or re-inspection or that part, a fee of $3,270.
For the purposes of subsection (1), where a survey or re-inspection, or part of a survey or re-inspection, is carried out outside Hong Kong, a reference to any time or date in that subsection (except the reference to general holiday in subsection (1)(c)) is the time or date according to the local time in the place where the survey or re-inspection, or that part, is carried out.
Subsection (1) does not apply if the application for the survey or re-inspection was made to the Director at least 3 days before the survey or re-inspection, or part of the survey or re-inspection, is carried out, but the Director has caused the survey or re-inspection or that part to be carried out outside office hours.
The fee to be paid under section 22(6) of the Survey Regulation is—
in the case of a declaration of survey of a Class II vessel, or a Class III vessel, that is a Category B vessel fitted with propulsion engine with total propulsion power not exceeding 30 BHP, $285;
in the case of a declaration of survey of any other vessel, $565.
The fee to be paid under section 59(2) of the Survey Regulation is—
in the case of a declaration of survey, submitted for the purposes of the issue of a survey record of safety equipment or Hong Kong load line certificate, $565;
in the case of a declaration of survey, submitted for the purposes of the issue of a freeboard assignment certificate—
of a Class II vessel the gross tonnage of which is less than 100, $285;
of any other vessel, $565;
in the case of a declaration of survey, submitted for the purposes of the issue of a declaration of fitness, $565.
The fee, under section 71 or 72 of the Survey Regulation, to be paid in respect of the issue of a new operating licence in respect of a local vessel is a fee equal to the aggregate of the following amounts—
for each of the following within the validity period of the licence—
the monthly period beginning on the first day of the validity period;
each subsequent monthly period,
an amount equal to 1/12 of the amount specified in subsection (2);
for each day within the validity period of the licence that does not fall within a monthly period referred to in paragraph (a)(i), an amount equal to 1/365 of the amount specified in subsection (2).
The amount specified for the purposes of subsection (1) is, for each person by which the number of passengers specified in the certificate of inspection or certificate of survey (as the case may be) in respect of the local vessel concerned exceeds the number of passengers shown in the existing operating licence in respect of the vessel, $165.
The fee, under section 72(3) of the Survey Regulation, to be paid in respect of the issue of a new certificate of inspection in respect of a local vessel is $565.
The fee, under section 72(3) of the Survey Regulation, to be paid in respect of the issue of a new certificate of survey in respect of a local vessel is—
in the case of a Class II vessel that is a Category B vessel fitted with propulsion engine with total propulsion power not exceeding 30 BHP, $285;
in the case of any other vessel, $565.
The fee, under section 85(4) of the Survey Regulation, to be paid in respect of an application for the issue of a duplicate of a certificate of inspection is $565.
The fee, under section 85(4) of the Survey Regulation, to be paid in respect of an application for the issue of a duplicate of a certificate of survey is—
in the case of a Class II vessel, or a Class III vessel, that is a Category B vessel fitted with propulsion engine with total propulsion power not exceeding 30 BHP, $285;
in the case of any other vessel, $565.
The fee, under section 85(4) of the Survey Regulation, to be paid in respect of an application for the issue of a duplicate of a survey record of safety equipment or Hong Kong load line certificate is $565.
The fee, under section 85(4) of the Survey Regulation, to be paid in respect of an application for the issue of a duplicate of a freeboard assignment certificate is—
in the case of a Class II vessel the gross tonnage of which is less than 100, $285;
in the case of any other vessel, $565.
The fee, under section 85(4) of the Survey Regulation, to be paid in respect of an application for the issue of a duplicate of a declaration of fitness is $565.
The fee, under section 76(5)(d)(iii) of the Survey Regulation, to be paid in respect of the re-issue of a certificate of inspection is $565.
The fee, under section 76(5)(d)(iii) of the Survey Regulation, to be paid in respect of the re-issue of a certificate of survey is—
in the case of a Class II vessel, or a Class III vessel, that is a Category B vessel fitted with propulsion engine with total propulsion power not exceeding 30 BHP, $285;
in the case of any other vessel, $565.
The fee, under section 76(5)(d)(iii) of the Survey Regulation, to be paid in respect of the re-issue of a survey record of safety equipment or Hong Kong load line certificate is $565.
The fee, under section 76(5)(d)(iii) of the Survey Regulation, to be paid in respect of the re-issue of a freeboard assignment certificate is—
in the case of a Class II vessel the gross tonnage of which is less than 100, $285;
in the case of any other vessel, $565.
The fee, under section 76(5)(d)(iii) of the Survey Regulation, to be paid in respect of the re-issue of a declaration of fitness is $565.
In this Part—
chargeable gross tonnage (須予繳費總噸位), in relation to a local vessel, means—(a)one half of the gross tonnage of the vessel; or(b)if that one half is not a multiple of 100, that one half rounded up to the next multiple of 100; specified permission (指明允許) means a written permission of the Director under section 70 of the Ordinance.The fee to be paid in respect of a specified permission for the purposes of section 41(1) of the Ordinance to break up a local vessel is—
if the vessel is to be broken up within the area of the Victoria port, a fee equal to the aggregate of the following amounts—
$875;
$79 for each 100 of the chargeable gross tonnage of the vessel for each day during which the permission is in force;
if the vessel is to be broken up elsewhere in the waters of Hong Kong, a fee equal to the aggregate of the following amounts—
$875;
$52 for each 100 of the chargeable gross tonnage of the vessel for each day during which the permission is in force.
Subject to subsection (2), the fee to be paid in respect of a specified permission for the purposes of section 8(1) of the General Regulation for a local vessel of a type described in column 2 of Schedule 4 to navigate in the waters of Hong Kong is, for each of the following—
the first monthly period, or part of it, of the period during which the vessel is so permitted;
each subsequent monthly period, if any, of the period during which the vessel is so permitted;
the remaining time of the period during which the vessel is so permitted,
the fee specified in column 3 of that Schedule opposite the type of vessel.
If, under the specified permission, the local vessel is permitted to carry more than 14 persons, there shall be payable in respect of the permission, for each of the following—
the first monthly period, or part of it, of the period during which the vessel is so permitted;
each subsequent monthly period, if any, of the period during which the vessel is so permitted;
the remaining time of the period during which the vessel is so permitted,
an additional fee of $14 for each person in excess of 14 that the vessel is permitted to carry.
The fee to be paid in respect of a specified permission for the purposes of section 25(1) of the General Regulation for a local vessel to moor to a Government mooring buoy is—
if the mooring buoy is a Class A buoy, $3,685 for each of the following—
the first day, or part of it, of the period when the buoy is used;
each subsequent day, if any, of that period;
the remaining time of that period;
if the mooring buoy is a Class B buoy, $2,455 for each of the following—
the first day, or part of it, of the period when the buoy is used;
each subsequent day, if any, of that period;
the remaining time of that period.
The fee to be paid in respect of a specified permission for the purposes of—
section 53(1) of the Ordinance;
section 4(2) or (4) of the Typhoon Shelters Regulation; or
section 9(1) or (2), 12(1), (2) or (3), 14, 15, 17, 18, 19(1), (2) or (3), 22(2)(e), (f) or (g), 23(1), 27(1) or (2), 28(1) or (2), 32(1), (2) or (3), 54(1) or (2), 84(1), 85(1), (2) or (3), 86(2), 87(1), 91(1), 92(1) or 93(1) of the General Regulation,
to do, cause or permit to be done, an act prohibited by the provision is $160.
The fee to be paid in respect of an exemption of the Director under section 69 of the Ordinance is—
in the case of an exemption from section 28 of the Ordinance, $525;
in the case of an exemption from section 3 of the General Regulation, $97;
in the case of any other exemption, $525.
In this Part—
relevant service (有關服務) means a service performed by the Director, upon request, under section 63A of the Ordinance; service period (服務期間), in relation to a service carried out by a specified officer, means—(a)the period of time, in hours, during which the service continues; or(b)if that period of time is not a whole number, the period of time rounded up to the next whole number; travel period (出差期間), in relation to a service carried out by a specified officer, means the period of time during which the officer is outside Hong Kong on account of the service.For the purposes of the definition of travel period, a specified officer is outside Hong Kong from the moment when he departs from Hong Kong to the moment when he arrives at Hong Kong.
The fee to be paid in respect of an attendance of a specified officer in any legal proceedings or inquiries, as a relevant service, is—
in the case of an attendance within Hong Kong, for each hour of the attendance period of each officer for the attendance, $1,115;
in the case of an attendance outside Hong Kong, a fee equal to the aggregate of the following amounts—
for each of the following—
the first 24 hours, or part of it, of the travel period of each officer for the attendance;
each subsequent period of 24 hours, if any, of that travel period;
the remaining time of that travel period,
an amount of $7,645;
an amount that is, in the opinion of the Director, equivalent to the travelling and subsistence expenses of each officer incurred during that travel period.
The fee to be paid in respect of a visit by a specified officer to a local vessel that is certificated under the Certification and Licensing Regulation for a particular class and a particular type, as a relevant service, for the purpose of giving advice as to whether or not the vessel is suitable to be certificated for another class or another type, is $365.
The fee to be paid in respect of a visit by a specified officer to a local vessel that is not certificated under the Certification and Licensing Regulation, as a relevant service, for the purpose of giving advice as to whether or not the vessel is suitable to be certificated for a particular class and a particular type, is $365.
The fee to be paid in respect of an examination by a specified officer of plans relating to the structure, machinery or equipment of a local vessel, as a relevant service, for the purpose of giving advice as to whether or not that structure, machinery or equipment complies with the requirement under the Ordinance, is, for each hour of the examination period of a specified officer for the examination, $1,115.
The fee to be paid in respect of a search by a specified officer of the record relating to a local vessel as contained in the certificate of ownership, full licence, temporary licence or permission for a laid-up vessel of the vessel in the office of the Marine Department, as a relevant service, is $175.
The fee to be paid in respect of a search by a specified officer of any record (other than a record referred to in subsection (1)) in the office of the Marine Department, as a relevant service, is $125.
The fee to be paid in respect of the issue by a specified officer, as a relevant service, of a certified true copy of—
a certificate of ownership, full licence, temporary licence or permission for a laid-up vessel, is $210;
a certificate of inspection, certificate of survey, survey record of safety equipment, Hong Kong load line certificate, freeboard assignment certificate or declaration of fitness, is $565;
any other document, is $160.
The fee to be paid in respect of the issue by a specified officer of a certified extract of any document, as a relevant service, is $160.
The fee to be paid in respect of the issue by a specified officer of an uncertified copy of any document, as a relevant service, is $9 for each sheet so issued.
The fee to be paid in respect of the issue by a specified officer of any written document to certify that a local vessel has been broken up by the Director, as a relevant service, is $175.
This Division applies only to the following services—
a visit by a specified officer to a local vessel, shore installation, navigation aid or other site, as a relevant service;
the reproduction of any drawing of a local vessel by a specified officer, as a relevant service; and
the examination of any equipment relating to a local vessel by a specified officer, as a relevant service.
Notwithstanding subsection (1), this Division does not apply to any service in respect of which a fee is prescribed in Division 1 of this Part.
Subject to section 37, the fee to be paid in respect of a service carried out in whole within Hong Kong by a specified officer is—
in the case of a service referred to in section 35(1)(a)—
for the first hour of the service period of each officer for the service, $3,270; and
for each subsequent hour of the service period of each officer for the service, $1,115;
in the case of a service referred to in section 35(1)(b) or (c), for each hour of the service period of each officer for the service, $1,115.
Subject to section 37, the fee to be paid in respect of a service carried out in whole outside Hong Kong by a specified officer sent from Hong Kong is the aggregate of the following amounts—
for each hour of the service period of each officer for the service, an amount of $1,115;
for each of the following—
the first 24 hours, or part of it, of the travel period of each officer for the service;
each subsequent period of 24 hours, if any, of that travel period;
the remaining time of that travel period,
an amount of $7,645;
an amount that is, in the opinion of the Director, equivalent to the travelling and subsistence expenses of each officer incurred during that travel period.
Subject to section 37, the fee to be paid in respect of a service carried out in part within Hong Kong by a specified officer, and in part outside Hong Kong by a specified officer sent from Hong Kong, is the aggregate of the following amounts—
for the part of the service carried out within Hong Kong, an amount equal to the fee calculated in accordance with subsection (1) as if that part was a service carried out in whole within Hong Kong;
for the part of the service carried out outside Hong Kong, an amount equal to the fee calculated in accordance with subsection (2) as if that part was a service carried out in whole outside Hong Kong.
If a service, or part of a service, is carried out (whether within Hong Kong or not) by a specified officer outside office hours, there shall be payable, in addition to the fee prescribed under section 36—
subject to paragraph (c), if the day of service is a weekday (other than a Saturday)—
for each hour of the service period of each officer for the service or that part between 6:30 a.m. and 8:30 a.m. or between 5:45 p.m. and 7:45 p.m., a fee of $1,115; and
for each hour of the service period of each officer for the service or that part before 6:30 a.m. or after 7:45 p.m., a fee of $2,215;
if the day of service is a Saturday or Sunday, for each hour of the service period of each officer for the service or that part, a fee of $3,270;
if the day of service falls on a calendar day that is a general holiday (other than a Saturday or Sunday) in Hong Kong, for each hour of the service period of each officer for the service or that part, a fee of $3,270.
For the purposes of subsection (1), where a service, or part of a service, is carried out outside Hong Kong, a reference to any time or date in that subsection (except the reference to general holiday in subsection (1)(c)) is the time or date according to the local time in the place where the service, or that part, is carried out.
Subsection (1) does not apply if the request for the service was made to the Director at least 3 days before the service, or part of the service, is carried out, but the Director has caused the service or that part to be carried out outside office hours.
Where—
at the request of any person, any service for a relevant matter is carried out; and
in consequence of the act of the person, the service is abandoned before it is completed,
the Director may reduce the fee payable in respect of the matter under this Regulation.
In exercising the power under subsection (1), the Director shall have regard to the nature and extent of the work involved in the service.
The Director may waive the fee to be paid under this Regulation (except section 33(1)) in respect of any service for a relevant matter that is carried out at the request of any public body, or the representative of a government other than the Government of Hong Kong, for official purposes.
The Director may waive the fee to be paid under section 33(1) in respect of the issue of a certified true copy of a document that—
is issued at the request of the Central People’s Government, or the representative of a government other than the Government of Hong Kong; and
is required for official purposes.
The Director may waive the fee to be paid under section 28(a) or (b) in respect of the granting of an exemption to a local vessel that—
is a Class III vessel or a Class IV vessel; and
is a vessel exempted under section 63 of the Shipping and Port Control Ordinance (Cap. 313) from the requirement of section 15 of that Ordinance.
In this Schedule—
chargeable area (須予繳費面積), in relation to a local vessel, means— (a)the area of the vessel in square metres; or (b)if that area is not a whole number, the area rounded up to the next whole number; relevant area (有關範圍) means an area of sea bed— (a)which is included in a lease of the foreshore adjacent to the area; or (b)the lease of which is granted in conjunction with a lease of the foreshore adjacent to the area; specified sheltered waters (指明遮蔽水域) means the waters specified in Schedule 2 to the Certification and Licensing Regulation; typhoon shelter (避風塘) means a typhoon shelter specified in column 2 of the Schedule to the Typhoon Shelters Regulation.| Item | Type of vessel | Fee | |
| Class I Vessel | |||
| 1. | Ferry vessel, launch or multi-purposes vessel— | ||
| (a)that is restricted in its full licence or temporary licence to ply within any specified sheltered waters or typhoon shelter— | |||
| (i)where the area of the vessel is less than 50 m2 | $345 | ||
| (ii)where the area of the vessel is 50 m2 or more but less than 100 m2 | $695 | ||
| (iii)where the area of the vessel is 100 m2 or more | $8.5 for each square metre of the chargeable area of the vessel | ||
| (b)that is not a vessel mentioned in paragraph (a)— | |||
| (i)where the area of the vessel is less than 50 m2 | $1,050 | ||
| (ii)where the area of the vessel is 50 m2 or more but less than 100 m2 | $2,090 | ||
| (iii)where the area of the vessel is 100 m2 or more but less than 400 m2 | $3,420 | ||
| (iv)where the area of the vessel is 400 m2 or more | $10 for each square metre of the chargeable area of the vessel | ||
| 2. | Floating restaurant, or stationary vessel certificated as a Class I vessel— | ||
| (a)where the area of the vessel is less than 800 m2 | $68 for each square metre of the chargeable area of the vessel | ||
| (b)where the area of the vessel is 800 m2 or more | $100 for each square metre of the chargeable area of the vessel | ||
| 3. | Primitive vessel— | ||
| (a)where the area of the vessel is less than 50 m2 | $345 | ||
| (b)where the area of the vessel is 50 m2 or more but less than 100 m2 | $695 | ||
| (c)where the area of the vessel is 100 m2 or more | $8.5 for each square metre of the chargeable area of the vessel | ||
| Class II Vessel | |||
| 4. | Transportation sampan fitted with propulsion engine— | ||
| (a)that is restricted in its full licence or temporary licence to ply within any specified sheltered waters or typhoon shelter | $210 | ||
| (b)that is not a vessel mentioned in paragraph (a)— | |||
| (i)where the area of the vessel is less than 55 m2 | $345 | ||
| (ii)where the area of the vessel is 55 m2 or more but less than 80 m2 | $695 | ||
| (iii)where the area of the vessel is 80 m2 or more but less than 120 m2 | $1,380 | ||
| (iv)where the area of the vessel is 120 m2 or more but less than 250 m2 | $13 for each square metre of the chargeable area of the vessel | ||
| (v)where the area of the vessel is 250 m2 or more but less than 400 m2 | $17 for each square metre of the chargeable area of the vessel | ||
| (vi)where the area of the vessel is 400 m2 or more but less than 600 m2 | $19 for each square metre of the chargeable area of the vessel | ||
| (vii)where the area of the vessel is 600 m2 or more but less than 800 m2 | $21 for each square metre of the chargeable area of the vessel | ||
| (viii)where the area of the vessel is 800 m2 or more but less than 1 000 m2 | $24 for each square metre of the chargeable area of the vessel | ||
| (ix)where the area of the vessel is 1 000 m2 or more but less than 1 300 m2 | $29 for each square metre of the chargeable area of the vessel | ||
| (x)where the area of the vessel is 1 300 m2 or more but less than 1 800 m2 | $30 for each square metre of the chargeable area of the vessel | ||
| (xi)where the area of the vessel is 1 800 m2 or more but less than 2 000 m2 | $35 for each square metre of the chargeable area of the vessel | ||
| (xii)where the area of the vessel is 2 000 m2 or more | $40 for each square metre of the chargeable area of the vessel | ||
| 5. | Transportation sampan not fitted with propulsion engine— | ||
| (a)that is restricted in its full licence or temporary licence to ply within any specified sheltered waters or typhoon shelter | $92 | ||
| (b)that is not a vessel mentioned in paragraph (a)— | |||
| (i)where the area of the vessel is less than 55 m2 | $180 | ||
| (ii)where the area of the vessel is 55 m2 or more but less than 80 m2 | $345 | ||
| (iii)where the area of the vessel is 80 m2 or more but less than 120 m2 | $695 | ||
| (iv)where the area of the vessel is 120 m2 or more but less than 250 m2 | $6.5 for each square metre of the chargeable area of the vessel | ||
| (v)where the area of the vessel is 250 m2 or more but less than 400 m2 | $8.5 for each square metre of the chargeable area of the vessel | ||
| (vi)where the area of the vessel is 400 m2 or more but less than 600 m2 | $9.5 for each square metre of the chargeable area of the vessel | ||
| (vii)where the area of the vessel is 600 m2 or more but less than 800 m2 | $11 for each square metre of the chargeable area of the vessel | ||
| (viii)where the area of the vessel is 800 m2 or more but less than 1 000 m2 | $12 for each square metre of the chargeable area of the vessel | ||
| (ix)where the area of the vessel is 1 000 m2 or more but less than 1 200 m2 | $13 for each square metre of the chargeable area of the vessel | ||
| (x)where the area of the vessel is 1 200 m2 or more but less than 1 400 m2 | $15 for each square metre of the chargeable area of the vessel | ||
| (xi)where the area of the vessel is 1 400 m2 or more but less than 1 800 m2 | $16 for each square metre of the chargeable area of the vessel | ||
| (xii)where the area of the vessel is 1 800 m2 or more | $19 for each square metre of the chargeable area of the vessel | ||
| 6. | Landing platform, or stationary vessel certificated as a Class II vessel— | ||
| (a)where the area of the vessel is less than 62 m2 | $1,760 | ||
| (b)where the area of the vessel is 62 m2 or more but less than 94 m2 | $3,470 | ||
| (c)where the area of the vessel is 94 m2 or more but less than 140 m2 | $6,940 | ||
| (d)where the area of the vessel is 140 m2 or more but less than 180 m2 | $10,360 | ||
| (e)where the area of the vessel is 180 m2 or more but less than 250 m2 | $73 for each square metre of the chargeable area of the vessel | ||
| (f)where the area of the vessel is 250 m2 or more but less than 350 m2 | $81 for each square metre of the chargeable area of the vessel | ||
| (g)where the area of the vessel is 350 m2 or more but less than 500 m2 | $86 for each square metre of the chargeable area of the vessel | ||
| (h)where the area of the vessel is 500 m2 or more | $90 for each square metre of the chargeable area of the vessel | ||
| 7. | Floating dock or floating workshop— | ||
| (a)that is moored to a relevant area— | |||
| (i)where the area of the vessel is less than 500 m2 | $7 for each square metre of the chargeable area of the vessel | ||
| (ii)where the area of the vessel is 500 m2 or more but less than 10 000 m2 | $9.5 for each square metre of the chargeable area of the vessel | ||
| (iii)where the area of the vessel is 10 000 m2 or more | $11 for each square metre of the chargeable area of the vessel | ||
| (b)that is not a vessel mentioned in paragraph (a)— | |||
| (i)where the area of the vessel is less than 500 m2 | $35 for each square metre of the chargeable area of the vessel | ||
| (ii)where the area of the vessel is 500 m2 or more but less than 10 000 m2 | $47.5 for each square metre of the chargeable area of the vessel | ||
| (iii)where the area of the vessel is 10 000 m2 or more | $55 for each square metre of the chargeable area of the vessel | ||
| 8. | Class II vessel fitted with propulsion engine (other than a transportation sampan, landing platform, stationary vessel, floating dock or floating workshop)— | ||
| (a)where the area of the vessel is less than 55 m2 | $345 | ||
| (b)where the area of the vessel is 55 m2 or more but less than 80 m2 | $695 | ||
| (c)where the area of the vessel is 80 m2 or more but less than 120 m2 | $1,380 | ||
| (d)where the area of the vessel is 120 m2 or more but less than 250 m2 | $13 for each square metre of the chargeable area of the vessel | ||
| (e)where the area of the vessel is 250 m2 or more but less than 400 m2 | $17 for each square metre of the chargeable area of the vessel | ||
| (f)where the area of the vessel is 400 m2 or more but less than 600 m2 | $19 for each square metre of the chargeable area of the vessel | ||
| (g)where the area of the vessel is 600 m2 or more but less than 800 m2 | $21 for each square metre of the chargeable area of the vessel | ||
| (h)where the area of the vessel is 800 m2 or more but less than 1 000 m2 | $24 for each square metre of the chargeable area of the vessel | ||
| (i)where the area of the vessel is 1 000 m2 or more but less than 1 300 m2 | $29 for each square metre of the chargeable area of the vessel | ||
| (j)where the area of the vessel is 1 300 m2 or more but less than 1 800 m2 | $30 for each square metre of the chargeable area of the vessel | ||
| (k)where the area of the vessel is 1 800 m2 or more but less than 2 000 m2 | $35 for each square metre of the chargeable area of the vessel | ||
| (l)where the area of the vessel is 2 000 m2 or more | $40 for each square metre of the chargeable area of the vessel | ||
| 9. | Class II vessel not fitted with propulsion engine (other than a transportation sampan, landing platform, stationary vessel, floating dock or floating workshop)— | ||
| (a)where the area of the vessel is less than 55 m2 | $180 | ||
| (b)where the area of the vessel is 55 m2 or more but less than 80 m2 | $345 | ||
| (c)where the area of the vessel is 80 m2 or more but less than 120 m2 | $695 | ||
| (d)where the area of the vessel is 120 m2 or more but less than 250 m2 | $6.5 for each square metre of the chargeable area of the vessel | ||
| (e)where the area of the vessel is 250 m2 or more but less than 400 m2 | $8.5 for each square metre of the chargeable area of the vessel | ||
| (f)where the area of the vessel is 400 m2 or more but less than 600 m2 | $9.5 for each square metre of the chargeable area of the vessel | ||
| (g)where the area of the vessel is 600 m2 or more but less than 800 m2 | $11 for each square metre of the chargeable area of the vessel | ||
| (h)where the area of the vessel is 800 m2 or more but less than 1 000 m2 | $12 for each square metre of the chargeable area of the vessel | ||
| (i)where the area of the vessel is 1 000 m2 or more but less than 1 200 m2 | $13 for each square metre of the chargeable area of the vessel | ||
| (j)where the area of the vessel is 1 200 m2 or more but less than 1 400 m2 | $15 for each square metre of the chargeable area of the vessel | ||
| (k)where the area of the vessel is 1 400 m2 or more but less than 1 800 m2 | $16 for each square metre of the chargeable area of the vessel | ||
| (l)where the area of the vessel is 1 800 m2 or more | $19 for each square metre of the chargeable area of the vessel | ||
| Class III Vessel | |||
| 10. | Class III vessel fitted with propulsion engine, the hull of which is not constructed of metal— | ||
| (a)where the area of the vessel is less than 90 m2 | $345 | ||
| (b)where the area of the vessel is 90 m2 or more but less than 200 m2 | $6.5 for each square metre of the chargeable area of the vessel | ||
| (c)where the area of the vessel is 200 m2 or more | $7.5 for each square metre of the chargeable area of the vessel | ||
| 11. | Class III vessel fitted with propulsion engine, the hull of which is constructed of metal— | ||
| (a)where the area of the vessel is less than 50 m2 | $345 | ||
| (b)where the area of the vessel is 50 m2 or more but less than 250 m2 | $12 for each square metre of the chargeable area of the vessel | ||
| (c)where the area of the vessel is 250 m2 or more | $15 for each square metre of the chargeable area of the vessel | ||
| 12. | Class III vessel not fitted with propulsion engine— | ||
| (a)where the area of the vessel is less than 50 m2 | $180 | ||
| (b)where the area of the vessel is 50 m2 or more but less than 100 m2 | $345 | ||
| (c)where the area of the vessel is 100 m2 or more | $5.5 for each square metre of the chargeable area of the vessel | ||
| Class IV Vessel | |||
| 13. | Class IV vessel— | ||
| (a)where the area of the vessel is less than 10 m2 | $335 | ||
| (b)where the area of the vessel is 10 m2 or more but less than 20 m2 | $670 | ||
| (c)where the area of the vessel is 20 m2 or more but less than 40 m2 | $1,340 | ||
| (d)where the area of the vessel is 40 m2 or more but less than 100 m2 | $1,340 plus $1,340 for each 20 m2 of the difference between the area of the vessel and 40 m2 (rounded up to the next multiple of 20 m2 if the difference is not a multiple of 20 m2) | ||
| (e)where the area of the vessel is 100 m2 or more but less than 220 m2 | $5,360 plus $1,340 for each 30 m2 of the difference between the area of the vessel and 100 m2 (rounded up to the next multiple of 30 m2 if the difference is not a multiple of 30 m2) | ||
| (f)where the area of the vessel is 220 m2 or more but less than 420 m2 | $10,720 plus $1,340 for each 40 m2 of the difference between the area of the vessel and 220 m2 (rounded up to the next multiple of 40 m2 if the difference is not a multiple of 40 m2) | ||
| (g)where the area of the vessel is 420 m2 or more | $17,420 plus $1,340 for each 60 m2 of the difference between the area of the vessel and 420 m2 (rounded up to the next multiple of 60 m2 if the difference is not a multiple of 60 m2) | ||
| Item | Matter | Fee | |
| 1. | An appointment by the certificated owner of a local vessel, under section 7 of the Certification and Licensing Regulation, of another person as an agent for the purposes of that Regulation | $355 | |
| 2. | The Director’s endorsement, under section 8(7) of the Certification and Licensing Regulation, of the termination of appointment of an agent | $355 | |
| 3. | A request by the certificated owner of a local vessel, or his agent, to the Director for the inclusion, under section 12(1) of the Certification and Licensing Regulation, of the business name of the certificated owner of the vessel in the certificate of ownership | $355 | |
| 4. | A request by the certificated owner of a local vessel, or his agent, to the Director for the making of an endorsement, under section 13(1) of the Certification and Licensing Regulation, on the certificate of ownership for the vessel | $355 | |
| 5. | A request by the certificated owner of a local vessel, or his agent, to the Director for the making of an endorsement, under section 14(1) of the Certification and Licensing Regulation, on the certificate of ownership for the vessel to the effect that a mortgage or hire-purchase agreement subsists in relation to the vessel | $355 | |
| 6. | An application for the purposes of section 23(1) of the Certification and Licensing Regulation | $355 | |
| 7. | An application for the purposes of section 26(1) of the Certification and Licensing Regulation | $355 | |
| 8. | An application for the purposes of section 23(1) of the Certification and Licensing Regulation as applying to a transfer of the ownership of a local vessel by virtue of section 29(1)(a) of that Regulation | $355 | |
| 9. | A notice of change in the particulars specified in the certificate of ownership, under section 37(1) of the Certification and Licensing Regulation— | ||
| (a)where the particular changed is the shore address in Hong Kong of the owner of the local vessel, or his agent, specified in the certificate of ownership | Nil | ||
| (b)where the particular changed is any other particulars specified in the certificate of ownership | $355 | ||
| 10. | An application by a certificated owner of a local vessel, or his agent, for the name of the local vessel to be specified in the certificate of ownership of the vessel under section 40(5) of the Certification and Licensing Regulation | $355 | |
| 11. | The issue of a duplicate of a certificate of ownership, full licence, temporary licence or permission for a laid-up vessel under section 54(1) of the Certification and Licensing Regulation | $355 |
| Item | Matter | Fee | |
| 1. | An application under section 4 of the General Regulation for an arrival clearance in respect of a local vessel (L.N. 103 of 2009) | $58 | |
| 2. | An application under section 6 of the General Regulation for a port clearance in respect of a local vessel (L.N. 103 of 2009) | $58 | |
| 3. | A permit to remain granted in respect of a local vessel under section 41 of the General Regulation, or renewed under section 42 of that Regulation— | ||
| (a)in the case of a permit that may be used for not more than 10 occasions within one monthly period— | |||
| (i)where the area of the vessel is less than 400 m2 | $4,100 | ||
| (ii)where the area of the vessel is 400 m2 or more | $4,100 plus $11 for each square metre of the difference, in square metres, between the area of the vessel and 400 m2 (rounded up to the next whole number if the difference is not a whole number) | ||
| (b)in the case of any other permit— | |||
| (i)for each occasion that the vessel remains in the waters of Hong Kong for not more than 7 consecutive days— | |||
| (A)where the area of the vessel is less than 400 m2 | $820 | ||
| (B)where the area of the vessel is 400 m2 or more | $820 plus $2.2 for each square metre of the difference, in square metres, between the area of the vessel and 400 m2 (rounded up to the next whole number if the difference is not a whole number) | ||
| (ii)for each occasion that the vessel remains in the waters of Hong Kong for 8 or more consecutive days— | |||
| (A)where the area of the vessel is less than 400 m2 | $820 for each of the following— (a)each period of 7 consecutive days during that occasion (b)the remaining days during that occasion | ||
| (B)where the area of the vessel is 400 m2 or more | $820 plus $2.2 for each square metre of the difference, in square metres, between the area of the vessel and 400 m2 (rounded up to the next whole number if the difference is not a whole number), for each of the following— (a)each period of 7 consecutive days during that occasion (b)the remaining days during that occasion | ||
| 4. | A duplicate copy of a permit to remain granted under section 43 of the General Regulation | $355 |
In this Schedule—
consideration period (考慮期間), in relation to the consideration of plans by a specified officer, means— (a)the period of time, in hours, during which the consideration continues; or (b)if that period of time is not a whole number, the period of time rounded up to the next whole number; specified number of passengers (指明乘客數目), in relation to a local vessel the subject matter of an application under section 8 or 17 of the Survey Regulation, means the maximum number of passengers that the vessel is intended to carry, as specified in that application.| Item | Type of vessel | Plan | Fee | ||
| 1. | Ferry vessel, launch or multi-purposes vessel— | ||||
| (a)where the specified number of passengers of the vessel is not more than 100 | all plans | $19,150 | |||
| (b)where the specified number of passengers of the vessel is more than 100 | all plans | $27,050 | |||
| 2. | Floating restaurant, or stationary vessel certificated as a Class I vessel | all plans | $46,200 | ||
| 3. | Primitive vessel | (a)plans relating to the assessment of the maximum permissible number of passengers of the vessel | $1,400 | ||
| (b)other plans | $5,000 | ||||
| 4. | Class II vessel that is a Category A vessel | all plans | $12,600 | ||
| 5. | Class II vessel that is a Category B vessel | (a)plans relating to the loading stability of the vessel | $1,400 | ||
| (b)other plans | $5,000 | ||||
| 6. | Class III vessel that is a Category A vessel | all plans | $12,600 | ||
| 7. | Class III vessel that is a Category B vessel | (a)plans relating to the loading stability of the vessel | $1,400 | ||
| (b)other plans | $5,000 | ||||
| 8. | Class IV vessel (other than one that falls within section 7(3)(b) or (ba) of the Survey Regulation)— (L.N. 71 of 2020) | ||||
| (a)where the specified number of passengers of the vessel is not more than 60 | all plans | $1,115 for each hour of the consideration period of each specified officer for considering the plan | |||
| (b)where the specified number of passengers of the vessel is 61 or more but not more than 100 | all plans | $19,150 | |||
| (c)where the specified number of passengers of the vessel is 101 or more | all plans | $27,050 |
| Item | Type of vessel | Fee | |
| Class I Vessel | |||
| 1. | Ferry vessel, launch or multi-purposes vessel— | ||
| (a)where the specified number of passengers of the vessel is 13 or more but not more than 60 | $2,200 | ||
| (b)where the specified number of passengers of the vessel is 61 or more but not more than 100 | $2,850 | ||
| (c)where the specified number of passengers of the vessel is 101 or more but not more than 500 | $4,950 | ||
| (d)where the specified number of passengers of the vessel is 501 or more | $4,950 plus $1,000 for each 100 passengers of the difference between the specified number of passengers of the vessel and 500 (rounded up to the next multiple of 100 if the difference is not a multiple of 100) | ||
| 2. | Floating restaurant, or stationary vessel certificated as a Class I vessel | $1,690 for each 100 passengers of the specified number of passengers of the vessel (rounded up to the next multiple of 100 if the specified number of passengers is not a multiple of 100) | |
| 3. | Primitive vessel— | ||
| (a)where the specified number of passengers of the vessel is 13 or more but not more than 30 | $800 | ||
| (b)where the specified number of passengers of the vessel is 31 or more but not more than 60 | $1,000 | ||
| (c)where the specified number of passengers of the vessel is 61 or more | $1,400 | ||
| Class II Vessel | |||
| 4. | Class II vessel that is a Category A vessel (other than a floating dock, pilot boat, transportation boat or tug) | $3,775 | |
| 5. | Floating dock that is classed with a classification society | $7,535 | |
| 6. | Pilot boat, or transportation boat, that is a Category A vessel | $2,200 | |
| 7. | Tug | $2,860 | |
| 8. | Class II vessel that is a Category B vessel fitted with propulsion engine— | ||
| (a)where the total engine power of the propulsion engine is not more than 15 BHP | $565 | ||
| (b)where the total engine power of the propulsion engine is more than 15 BHP but not more than 30 BHP | $780 | ||
| (c)where the total engine power of the propulsion engine is more than 30 BHP but not more than 50 BHP | $1,045 | ||
| (d)where the total engine power of the propulsion engine is more than 50 BHP but not more than 80 BHP | $1,335 | ||
| (e)where the total engine power of the propulsion engine is more than 80 BHP | $1,335 plus $150 for each 40 BHP of the difference between the total engine power of the propulsion engine and 80 BHP (rounded up to the next multiple of 40 BHP if the difference is not a multiple of 40 BHP) | ||
| 9. | Class II vessel that is a Category B vessel not fitted with propulsion engine | $1,145 | |
| 10. | Class II vessel that is a Category B vessel not fitted with propulsion engine but is fitted with auxiliary machinery | $1,145 plus $1,145 for each auxiliary machinery so fitted | |
| Class III Vessel | |||
| 11. | Class III vessel that is a Category A vessel | $3,775 | |
| 12. | Class III vessel that is a Category B vessel fitted with propulsion engine— | ||
| (a)where the total engine power of the propulsion engine is not more than 15 BHP | $565 | ||
| (b)where the total engine power of the propulsion engine is more than 15 BHP but not more than 30 BHP | $780 | ||
| (c)where the total engine power of the propulsion engine is more than 30 BHP but not more than 50 BHP | $1,045 | ||
| (d)where the total engine power of the propulsion engine is more than 50 BHP but not more than 80 BHP | $1,335 | ||
| (e)where the total engine power of the propulsion engine is more than 80 BHP | $1,335 plus $150 for each 40 BHP of the difference between the total engine power of the propulsion engine and 80 BHP (rounded up to the next multiple of 40 BHP if the difference is not a multiple of 40 BHP) | ||
| Class IV Vessel | |||
| 13. | Class IV vessel (other than one that falls within section 15(2)(b) or (ba) of the Survey Regulation)— (L.N. 71 of 2020) | ||
| (a)where the specified number of passengers of the vessel is not more than 60 | $2,200 | ||
| (b)where the specified number of passengers of the vessel is 61 or more but not more than 100 | $2,850 | ||
| (c)where the specified number of passengers of the vessel is 101 or more but not more than 500 | $4,950 | ||
| (d)where the specified number of passengers of the vessel is 501 or more | $4,950 plus $1,000 for each 100 passengers of the difference between specified number of passengers of the vessel and 500 (rounded up to the next multiple of 100 if the difference is not a multiple of 100) | ||
| Item | Type of vessel | Fee | |
| 1. | Local vessel in respect of which no survey record of safety equipment has ever been issued— | ||
| (a)where the gross tonnage of the vessel is less than 150 | $18,615 | ||
| (b)where the gross tonnage of the vessel is 150 or more but less than 500 | $28,600 | ||
| (c)where the gross tonnage of the vessel is 500 or more but less than 1 600 | $103,160 | ||
| (d)where the gross tonnage of the vessel is 1 600 or more | $154,950 | ||
| 2. | Local vessel in respect of which a survey record of safety equipment was issued— | ||
| (a)where the gross tonnage of the vessel is less than 150 | $3,435 | ||
| (b)where the gross tonnage of the vessel is 150 or more but less than 500 | $4,170 | ||
| (c)where the gross tonnage of the vessel is 500 or more but less than 1 600 | $8,095 | ||
| (d)where the gross tonnage of the vessel is 1 600 or more | $12,020 |
| Item | Type of vessel | Fee | |
| 1. | Local vessel in respect of which no Hong Kong load line certificate has ever been issued— | ||
| (a)where the gross tonnage of the vessel is less than 150 | $39,160 | ||
| (b)where the gross tonnage of the vessel is 150 or more but less than 200 | $47,500 | ||
| (c)where the gross tonnage of the vessel is 200 or more but less than 300 | $58,730 | ||
| (d)where the gross tonnage of the vessel is 300 or more but less than 500 | $78,310 | ||
| (e)where the gross tonnage of the vessel is 500 or more but less than 1 000 | $97,860 | ||
| (f)where the gross tonnage of the vessel is 1 000 or more but less than 1 500 | $117,440 | ||
| (g)where the gross tonnage of the vessel is 1 500 or more | $137,020 | ||
| 2. | Local vessel in respect of which a Hong Kong load line certificate was issued— | ||
| (a)where the gross tonnage of the vessel is less than 150 | $11,000 | ||
| (b)where the gross tonnage of the vessel is 150 or more but less than 200 | $13,250 | ||
| (c)where the gross tonnage of the vessel is 200 or more but less than 300 | $15,750 | ||
| (d)where the gross tonnage of the vessel is 300 or more but less than 500 | $19,550 | ||
| (e)where the gross tonnage of the vessel is 500 or more but less than 1 000 | $23,350 | ||
| (f)where the gross tonnage of the vessel is 1 000 or more but less than 1 500 | $29,150 | ||
| (g)where the gross tonnage of the vessel is 1 500 or more | $34,950 |
| Item | Type of vessel | Fee | |
| 1. | Local vessel the gross tonnage of which is less than 100 | $770 | |
| 2. | Local vessel the gross tonnage of which is 100 or more but less than 200 | $1,060 | |
| 3. | Local vessel the gross tonnage of which is 200 or more but less than 300 | $1,350 | |
| 4. | Local vessel the gross tonnage of which is 300 or more | $1,600 |
In this Part—
class (類), in relation to a substance or article, means class 1, class 2, class 3, class 4, class 5, class 6, class 7, class 8 or class 9 as defined in chapter 2.0.1.1 of the IMDG Code; IMDG Code (《IMDG規則》) means the International Maritime Dangerous Goods Code published by the International Maritime Organization, as amended or revised by the Organization from time to time.For the fees specified in column 3 in section 2 of this Part, if a class of substance or article is subdivided into other classes or divisions under the IMDG Code, those other classes or divisions are to be regarded as the class under which they are subdivided.
| Item | Type of vessel | Fee | |
| 1. | Local vessel other than oil carrier | $815 for each class of substance or article | |
| 2. | Oil carrier— | ||
| (a)where the gross tonnage of the vessel is less than 500 | $1,895 for each class of substance or article | ||
| (b)where the gross tonnage of the vessel is 500 or more | $3,775 for each class of substance or article |
| Item | Type of vessel | Fee | |
| 1. | Local vessel the area of which is less than 10 m2 | $28 | |
| 2. | Local vessel the area of which is 10 m2 or more but less than 20 m2 | $56 | |
| 3. | Local vessel the area of which is 20 m2 or more but less than 40 m2 | $112 | |
| 4. | Local vessel the area of which is 40 m2 or more but less than 100 m2 | $112 plus $112 for each 20 m2 of the difference between the area of the vessel and 40 m2 (rounded up to the next multiple of 20 m2 if the difference is not a multiple of 20 m2) | |
| 5. | Local vessel the area of which is 100 m2 or more but less than 220 m2 | $448 plus $112 for each 30 m2 of the difference between the area of the vessel and 100 m2 (rounded up to the next multiple of 30 m2 if the difference is not a multiple of 30 m2) | |
| 6. | Local vessel the area of which is 220 m2 or more but less than 420 m2 | $896 plus $112 for each 40 m2 of the difference between the area of the vessel and 220 m2 (rounded up to the next multiple of 40 m2 if the difference is not a multiple of 40 m2) | |
| 7. | Local vessel the area of which is 420 m2 or more | $1,456 plus $112 for each 60 m2 of the difference between the area of the vessel and 420 m2 (rounded up to the next multiple of 60 m2 if the difference is not a multiple of 60 m2) |