Noise Control (Construction Work) Regulation
(Enacting provision omitted—E.R. 1 of 2019)
[1 May 1996]
(Format changes—E.R. 1 of 2019)
(Omitted as spent—E.R. 1 of 2019)
In this Regulation—
formwork (模板) means any type of metallic, wooden or fibreglass construction including any structural support designed to enable concrete, cement or other material poured in a fluid state to assume a particular shape upon setting; hammering (敲擊) means to strike repeatedly any object, instrument or surface with any other object, instrument or surface; rubble (瓦礫) means any kind of debris or superfluous material arising from construction work including bricks, concrete, metal, glass, wood, plastic, earth, rock, bamboo or fibreglass; scaffolding (棚架) means any type of construction made of metal, wood or bamboo whose purpose is to enable temporary access to a part or parts of another structure or building whether completed or not.The construction work in the Schedule is prescribed for the purpose of section 6(2) of the Ordinance.
Erection or dismantling of formwork or scaffolding
Loading, unloading or handling of rubble, wooden boards, steel bars, wood or scaffolding material
Hammering